{"id":133731,"date":"2015-08-24T16:10:36","date_gmt":"2015-08-24T20:10:36","guid":{"rendered":"https:\/\/www.livabl.com\/articles\/?p=133731"},"modified":"2024-02-19T02:09:20","modified_gmt":"2024-02-19T07:09:20","slug":"construction-jaedon-mews-underway-occupancy-winter","status":"publish","type":"post","link":"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter","title":{"rendered":"Construction at Jaedon Mews is well underway, occupancy slated for this winter"},"content":{"rendered":"<h4 id='pressboard-ad-sponsorship-tag' style='margin-bottom: 35px;'><\/h4><p><a href=\"https:\/\/www.livabl.com\/articles\/wp-content\/uploads\/2015\/08\/Jaedon-Mews-compressed.jpg\" rel=\"lightbox[133731]\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-large wp-image-133838\" src=\"https:\/\/www.livabl.com\/articles\/wp-content\/uploads\/2015\/08\/Jaedon-Mews-compressed-1024x800.jpg\" alt=\"Jaedon Mews\" width=\"1024\" height=\"800\" \/><\/a><a href=\"https:\/\/www.livabl.com\/toronto-on\/jaedon-mews\" target=\"_blank\" rel=\"noopener\">Jaedon Mews<\/a>, <a href=\"https:\/\/www.livabl.com\/builder\/urbanquest-incorporated\" target=\"_blank\" rel=\"noopener\">Urbanquest<\/a>\u2019s townhouse development in Little Italy, is well on its way to completion, with exteriors almost finished and windows being installed. If all goes to plan, buyers will be able move in as early as this winter.<\/p>\n<p><span style=\"font-weight: 400\">Those interested in purchasing their own home had better hurry: only three townhomes remain in the highly sought-after development. The remaining units are 31 Achtman Lane, a semi priced at $1,279,600, 33 Achtman Lane, an end unit priced at $1,249,600 and 39 Achtman Lane, another end unit priced at $1,224,600. <\/span><\/p>\n<p><span style=\"font-weight: 400\">The exclusive enclave of freehold homes is an urban oasis nestled in Little Italy. Located at 456 Shaw Street, the homes are surrounded by some of the most charming restaurants and shops in the city like Bar Isabel, Bestellen, Chiado and more. <\/span><\/p>\n<p><span style=\"font-weight: 400\">The Jaedon Mews is just steps away from the hip intersection of College and Ossington, one of Toronto\u2019s most vibrant, distinct areas. Not only is the neighbourhood teeming with unique hot spots and hangouts, but the College streetcar is virtually at your doorstep, making your morning commute a no-fuss process.<\/span><\/p>\n<p><span style=\"font-weight: 400\">In addition to Jaedon Mews\u2019 connected and thriving neighbourhood, the development\u2019s design is indeed something to be admired. Each home features contemporary details throughout like floating staircases with glass walls, stylish, floating Scavolini vanities and a European-style loggia off the front entryway. <\/span><\/p>\n<p><span style=\"font-weight: 400\">Soaring ceilings and a dramatic, Scavolini kitchen punctuated by an oversized skylight give the space an airy feel. Plus, each unit comes with a full-floor penthouse master suite with an \u201cen-spa\u201d and an in-law suite\/media room in the basement, making it a comfortable space for homeowners and guests alike.<\/span><\/p>\n<p><i><span style=\"font-weight: 400\">To find out more about Jaedon Mews, visit <a href=\"http:\/\/urban-quest.format.com\/\" target=\"_blank\" rel=\"noopener\" class=\"external\">jaedonmews.com<\/a> or call 647 350 0456.<\/span><\/i><\/p>\n<div id='pressboard-ad-sponsorship-msg'><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Those interested in purchasing their own home had better hurry!<\/p>\n","protected":false},"author":1,"featured_media":133838,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","apple_news_api_created_at":"","apple_news_api_id":"","apple_news_api_modified_at":"","apple_news_api_revision":"","apple_news_api_share_url":"","apple_news_coverimage":0,"apple_news_coverimage_caption":"","apple_news_is_hidden":false,"apple_news_is_paid":false,"apple_news_is_preview":false,"apple_news_is_sponsored":false,"apple_news_maturity_rating":"","apple_news_metadata":"\"\"","apple_news_pullquote":"","apple_news_pullquote_position":"","apple_news_slug":"","apple_news_sections":[],"apple_news_suppress_video_url":false,"apple_news_use_image_component":false,"footnotes":""},"categories":[11269],"tags":[],"coauthors":[8648],"apple_news_notices":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Construction at Jaedon Mews is well underway, occupancy slated for this winter | Livabl<\/title>\n<meta name=\"description\" content=\"Construction at Jaedon Mews is well underway, occupancy slated for this winter.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction at Jaedon Mews is well underway, occupancy slated for this winter | Livabl\" \/>\n<meta property=\"og:description\" content=\"Construction at Jaedon Mews is well underway, occupancy slated for this winter.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter\" \/>\n<meta property=\"og:site_name\" content=\"Livabl\" \/>\n<meta property=\"article:published_time\" content=\"2015-08-24T20:10:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-02-19T07:09:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.livabl.com\/articles\/wp-content\/uploads\/2015\/08\/Jaedon-Mews-compressed.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"buzzhomeblog\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"buzzhomeblog\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter\",\"url\":\"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter\",\"name\":\"Construction at Jaedon Mews is well underway, occupancy slated for this winter | Livabl\",\"isPartOf\":{\"@id\":\"https:\/\/www.livabl.com\/articles\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.livabl.com\/articles\/wp-content\/uploads\/2015\/08\/Jaedon-Mews-compressed.jpg\",\"datePublished\":\"2015-08-24T20:10:36+00:00\",\"dateModified\":\"2024-02-19T07:09:20+00:00\",\"author\":{\"@id\":\"https:\/\/www.livabl.com\/articles\/#\/schema\/person\/834a96a95ef43e5e12830e8bf7e11645\"},\"description\":\"Construction at Jaedon Mews is well underway, occupancy slated for this winter.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter#primaryimage\",\"url\":\"https:\/\/www.livabl.com\/articles\/wp-content\/uploads\/2015\/08\/Jaedon-Mews-compressed.jpg\",\"contentUrl\":\"https:\/\/www.livabl.com\/articles\/wp-content\/uploads\/2015\/08\/Jaedon-Mews-compressed.jpg\",\"width\":1024,\"height\":800,\"caption\":\"Jaedon Mews\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Articles\",\"item\":\"https:\/\/www.livabl.com\/articles\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Archives\",\"item\":\"https:\/\/www.livabl.com\/articles\/archives\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Construction at Jaedon Mews is well underway, occupancy slated for this winter\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.livabl.com\/articles\/#website\",\"url\":\"https:\/\/www.livabl.com\/articles\/\",\"name\":\"Livabl\",\"description\":\"Building New Home Dreams\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.livabl.com\/articles\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.livabl.com\/articles\/#\/schema\/person\/834a96a95ef43e5e12830e8bf7e11645\",\"name\":\"buzzhomeblog\",\"sameAs\":[\"https:\/\/www.livabl.com\"],\"url\":\"https:\/\/www.livabl.com\/articles\/author\/buzzhomeblog\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction at Jaedon Mews is well underway, occupancy slated for this winter | Livabl","description":"Construction at Jaedon Mews is well underway, occupancy slated for this winter.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter","og_locale":"en_US","og_type":"article","og_title":"Construction at Jaedon Mews is well underway, occupancy slated for this winter | Livabl","og_description":"Construction at Jaedon Mews is well underway, occupancy slated for this winter.","og_url":"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter","og_site_name":"Livabl","article_published_time":"2015-08-24T20:10:36+00:00","article_modified_time":"2024-02-19T07:09:20+00:00","og_image":[{"width":1024,"height":800,"url":"https:\/\/www.livabl.com\/articles\/wp-content\/uploads\/2015\/08\/Jaedon-Mews-compressed.jpg","type":"image\/jpeg"}],"author":"buzzhomeblog","twitter_misc":{"Written by":"buzzhomeblog","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter","url":"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter","name":"Construction at Jaedon Mews is well underway, occupancy slated for this winter | Livabl","isPartOf":{"@id":"https:\/\/www.livabl.com\/articles\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter#primaryimage"},"image":{"@id":"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter#primaryimage"},"thumbnailUrl":"https:\/\/www.livabl.com\/articles\/wp-content\/uploads\/2015\/08\/Jaedon-Mews-compressed.jpg","datePublished":"2015-08-24T20:10:36+00:00","dateModified":"2024-02-19T07:09:20+00:00","author":{"@id":"https:\/\/www.livabl.com\/articles\/#\/schema\/person\/834a96a95ef43e5e12830e8bf7e11645"},"description":"Construction at Jaedon Mews is well underway, occupancy slated for this winter.","breadcrumb":{"@id":"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter#primaryimage","url":"https:\/\/www.livabl.com\/articles\/wp-content\/uploads\/2015\/08\/Jaedon-Mews-compressed.jpg","contentUrl":"https:\/\/www.livabl.com\/articles\/wp-content\/uploads\/2015\/08\/Jaedon-Mews-compressed.jpg","width":1024,"height":800,"caption":"Jaedon Mews"},{"@type":"BreadcrumbList","@id":"https:\/\/www.livabl.com\/articles\/archives\/construction-jaedon-mews-underway-occupancy-winter#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Articles","item":"https:\/\/www.livabl.com\/articles"},{"@type":"ListItem","position":2,"name":"Archives","item":"https:\/\/www.livabl.com\/articles\/archives"},{"@type":"ListItem","position":3,"name":"Construction at Jaedon Mews is well underway, occupancy slated for this winter"}]},{"@type":"WebSite","@id":"https:\/\/www.livabl.com\/articles\/#website","url":"https:\/\/www.livabl.com\/articles\/","name":"Livabl","description":"Building New Home Dreams","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.livabl.com\/articles\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.livabl.com\/articles\/#\/schema\/person\/834a96a95ef43e5e12830e8bf7e11645","name":"buzzhomeblog","sameAs":["https:\/\/www.livabl.com"],"url":"https:\/\/www.livabl.com\/articles\/author\/buzzhomeblog"}]}},"_links":{"self":[{"href":"https:\/\/www.livabl.com\/articles\/wp-json\/wp\/v2\/posts\/133731"}],"collection":[{"href":"https:\/\/www.livabl.com\/articles\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.livabl.com\/articles\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.livabl.com\/articles\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.livabl.com\/articles\/wp-json\/wp\/v2\/comments?post=133731"}],"version-history":[{"count":0,"href":"https:\/\/www.livabl.com\/articles\/wp-json\/wp\/v2\/posts\/133731\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.livabl.com\/articles\/wp-json\/wp\/v2\/media\/133838"}],"wp:attachment":[{"href":"https:\/\/www.livabl.com\/articles\/wp-json\/wp\/v2\/media?parent=133731"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.livabl.com\/articles\/wp-json\/wp\/v2\/categories?post=133731"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.livabl.com\/articles\/wp-json\/wp\/v2\/tags?post=133731"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/www.livabl.com\/articles\/wp-json\/wp\/v2\/coauthors?post=133731"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}